Enstrom begins Royal Thai Army Aircraft Production

March 08, 2011
March 8, 2011 – Enstrom Helicopter Corporation would like to announce that the first three, of a contracted sixteen, 480B advanced turbine training helicopters for the Royal Thai Army have been completed at the Enstrom factory. The aircraft have been equipped with a number of advanced features, including NVG compatible cockpits, Chelton EFIS systems, and dual Wulfsberg RT-5000 tactical radio systems.
Enstrom
 

 
“These represent some of the most advanced aircraft we have built to date,” commented Enstrom’s Director of Engineering, Bill Taylor. “That we were able to get them engineered and into production so quickly is a testament to our team in Menominee, and our support from the FAA’s Chicago Aircraft Certification Office. The Royal Thai Army is going to have some very capable helicopters.”

The 480B was selected in a competitive bidding process that included aircraft from 7 different major manufacturers. Aircrew and maintenance personnel training is scheduled to begin in March, with aircraft deliveries following soon after.

Enstrom is represented in Asia by Blake & DeJong Ltd., and in Thailand by M-Landarch Inc. For more information on Blake & DeJong Ltd., please contact This e-mail address is being protected from spambots. You need JavaScript enabled to view it . For more information on M-Landarch Inc, please visit www.m-landarch.com.

For more information visit: Enstromhelicopter.com

Add comment


Security code
Refresh

Subscription Centre

 
New Subscription
 
Already a Subscriber
 
Customer Service
 
View Digital Magazine Renew

Most Popular

Latest Events

HAI Heli-Expo
February 26-1, 2018
MRO Americas 2018
April 10-12, 2018
CANSEC 2018
May 30, 2018